Requirement of Items at IIT Dharwad under Local Purchase Mode of Procurement
| Sl. No | Description of the Required Item | LPC No. | Quotation Submission Deadline | Details | edit |
|---|---|---|---|---|---|
|
106
|
Supply Installation and Commissioning of Large-scale direct shear test equipment with pullout assembly
|
IITDH/P1B/MMD/LPC/CIE/2025-26/341
|
27-10-2025
|
||
|
107
|
Supply Installation and Commissioning of Stylus profilometer / Surface roughness measurement instrument
|
IITDH/P1B/MMD/LPC/CIE/2025-26/377
|
27-10-2025
|
||
|
108
|
Supply Installation and Commissioning of Pile Integrity Test Instrument
|
IITDH/P1B/MMD/LPC/CIE/2025-26/339
|
27-10-2025
|
||
|
109
|
Supply ,Installation and Commissioning of Data acquisition modules with compatible cables
|
IITDH/P1B/MMD/LPC/PHY/2025-26/315
|
27-10-2025
|
||
|
110
|
Supply Installation and Commissioning of PDMS Mixer
|
IITDH/P1B/MMD/LPC/EECE/2025-26/320
|
26-10-2025
|
||
|
111
|
Supply Installation and Commissioning of Transportation Engineering Equipment
|
IITDH/P1B/MMD/LPC/CIE/2025-26/360
|
24-10-2025
|
||
|
112
|
Aluminium Partition work Academic Block I 301
|
IITDH/IPS/2025-26/LPC/162
|
24-10-2025
|
||
|
113
|
Decoration Items
|
IITDH/IPS/2025-26/LPC/15
|
24-10-2025
|
||
|
114
|
Supply Installation and Commissioning of Freeze Thaw Chamber
|
IITDH/P1B/MMD/LPC/CIE/2025-26/306
|
23-10-2025
|
||
|
115
|
Supply Installation and Commissioning of Repeated Load Testing System
|
IITDH/P1B/MMD/LPC/CIE/2025-26/342
|
23-10-2025
|
||
|
116
|
Supply Installation and Commissioning of Multispeed Loading Frame
|
IITDH/P1B/MMD/LPC/CIE/2025-26/242
|
23-10-2025
|
||
|
117
|
Supply and Installation of INFRA RED viewer
|
IITDH/P1B/MMD/LPC/PHY/2025-26/330
|
20-10-2025
|
||
|
118
|
Supply and Installation of Diode laser @405mm
|
IITDH/P1B/MMD/LPC/PHY/2025-26/329
|
20-10-2025
|
||
|
119
|
Supply and Installation of Turbomolecular pump system with backing pump and gauges
|
IITDH/P1B/MMD/LPC/PHY/2025-26/236
|
20-10-2025
|
||
|
120
|
Supply and Installation of Ultra-high vacuum (UHV) chamber and the mounting stand and flanges (RIMS Facility)
|
IITDH/P1B/MMD/LPC/PHY/2025-26/234
|
20-10-2025
|
||
|
121
|
Supply and Installation of Thermal Sensors with Accessories
|
IITDH/P1B/MMD/LPC/PHY/2025-26/327
|
20-10-2025
|
||
|
122
|
Supply and Installation of Optics and Optomechanics
|
IITDH/P1B/MMD/LPC/PHY/2025-26/326
|
20-10-2025
|
||
|
123
|
Supply of Video camera, still camera and Camera Lens
|
IITDH/MMD/LPC/PRO/2025-26/026
|
17-10-2025
|
||
|
124
|
Supply of Manpower for Landscape Maintenance
|
IITDH/IPS/2025-26/LPC/159
|
17-10-2025
|
||
|
125
|
Electric Work for CMT Welding Machine
|
IITDH/IPS/2025-26/LPC/154
|
15-10-2025
|
||
|
126
|
Supply of Battery
|
IITDH/IPS/2025-26/LPC/163
|
15-10-2025
|
||
|
127
|
Supply and Installation of 2-way switch & lineup switch.
|
IITDH/MMD/LPC/CHEM/2025-26/25
|
10-10-2025
|
||
|
128
|
Procurement of Organic Manure
|
IITDH/IPS/2025-26/LPC/144
|
29-09-2025
|
||
|
129
|
Supply and Installation of SS-304 trough at A2-009
|
IITDH/IPS/2025-26/LPC/150
|
25-09-2025
|
||
|
130
|
Supply and Installation of Spin Coater
|
IITDH/MMD/LPC/CHEM/2025-26/24
|
22-09-2025
|
||
|
131
|
Cleaning of RCC Storm water drain
|
IITDH/IPS/2025-26/LPC/136
|
16-09-2025
|
||
|
132
|
UPS connection for the CLT 500+-Seater stage lights, normal lights & power distribution boards
|
IITDH/IPS/2025-26/LPC/123
|
16-09-2025
|
||
|
133
|
Supply and Installation of Jetson Orin Nano Super Developer Kit
|
IITDH/MMD/LPC/CSE/2025-26/023
|
15-09-2025
|
||
|
134
|
Supply Installation and Commissioning of CPU-GPU system with Intel core ultra 7 155H
|
IITDH/MMD/LPC/CSE/2025-26/022
|
15-09-2025
|
||
|
135
|
Supply Installation and Commissioning of CPU-GPU system with Intel core -i9 and Nvidia RTX ADA 5000 GPU
|
IITDH/MMD/LPC/CSE/2025-26/020
|
15-09-2025
|
||
|
136
|
Supply Installation and Commissioning of CPU-GPU system with snapdragon (R) X Elite XIE-80-100 and Qualcomm Adreno GPU
|
IITDH/MMD/LPC/CSE/2025-26/021
|
15-09-2025
|
||
|
137
|
Supply and Installation of Medical Equipment to Upgrade the Existing Outsourced Ambulance
|
IITDH/MMD/LPC/C&S/2025-26/18
|
10-09-2025
|
||
|
138
|
Supply and Installation of Medical Equipment to Establish Emergency Room at Wellness Centre
|
IITDH/MMD/LPC/C&S/2025-26/19
|
10-09-2025
|
||
|
139
|
Vinyl Flooring Work at CLT
|
IITDH/IPS/2025-26/LPC/130
|
09-09-2025
|
||
|
140
|
UPS Connection & Power Distribution
|
IITDH/IPS/2025-26/LPC/129
|
09-09-2025
|